top of page

2015

  • Izmir- Bayrakli Integrated Health Campus / 2015

GAMA -TÜRKERLER Joint Venture/ Ambito & Argola Arquitectos' Local Project Manager and Coordinator / Total bed capacity of 1653-Beds / 789-Bed General Hospital, 372-Bed Cardiovascular Diseases Hospital, 88-Bed Oncology hospital, 404-Bed Women’s and Children’s Hospital + 300-Bed High-Security Forensic Psychiatric Hospital + 100-Bed Physical Therapy and Rehabilitation Hospital.

 

  • Kocaeli Integrated Health Campus / 2015

GAMA -TÜRKERLER Joint Venture  / Ambito & Argola Arquitectos' Local Project Manager and Coordinator/  Total bed capacity of 1180-Beds / 494-Bed General Hospital, 124-Bed Cardiovascular Diseases Hospital, 116-Bed Oncology hospital, 246-Bed Women’s and Children’s Hospital + 100-Bed High-Security Forensic Psychiatric Hospital + 100-Bed Physical Therapy and Rehabilitation Hospital Units - 25 Intensive Care Units - 8 Operation Rooms - 27 Bed Emergency Service.

 

  • Sanlıurfa – Birecik 150 bed State Hospital / 2015

20.480 M2 Project Area - 22.672 M2 Construction Area - 150 Beds - 37 Polyclinics Examination Room - 5  Bed Special Clinics for Physchiatry - 13 Hemodialysis Units - 15 Intensive Care Units - 5 Operation Rooms - 23 Bed Emergency Service.

 

 

 

  • Çözüm College Campus - Ankara / 2015

6.500 m2 land area - 13.940 m2 construction area - 49 classes - In total 1.410 students in Kindergarden, Primary School, Secondary School and High School - 18 Laboratories - Swimming pool - Sports hall -320 seating capacity Multi purpose hall.

 

 

 

  • Mardin Final College Campus - Mardin / 2015

29.086 m2 land area - 11.120 m2 construction area - 35 classes - In total 1.020 students in Kindergarden, Primary School, Secondary School and High School - 12 Laboratories - Swimming pool - Sports hall - 250 seating capacity Multi purpose hall.

 

 

 

  • AC Architecture 12 Houses - Ankara / 2015

14.000 m2 Land area - 2.800 m2 Construction area - Recreation area.

 

 

 

 

 

  • ACB Dormitory - Diyarbakır / 2015

4.477 M2 Project Area - 2.685 M2 Construction Area - 112 Beds - Swimming Pool.

 

 

 

 

 

  • ULGEN Group Head Office - Ankara / 2015

300 m2 land area - 400 m2 construction and interior design area.

 

 

 

 

 

  • MAIDAN Towers Office Interior Design - Ankara / 2015

Alternative office interior designs for sales.

 

 

 

 

 

  • Ankrya Head Office Interior Design - Next Level - Ankara / 2015

320 m2 interior design area.

 

 

 

 

 

  • SILVIAN HEACH - One Tower - Ankara / 2015

100 M2 construction area.

 

 

 

 

 

  • Murat ARISOY House - Sinpaş Altınoran - Ankara / 2015

 

 

 

 

 

 

  • Serhan SULTANOGLU House - Sinpaş Altınoran - Ankara / 2015

 

 

 

 

 

 

  • Orkun ABALI House - Sinpaş Altınoran - Ankara / 2015

 

 

 

 

 

 

  • Okan OZTURK House - Sinpaş Altınoran - Ankara / 2015

 

bottom of page